How to read your building’s fit-out guide before you sign a lease

Ask for the building’s fit-out guide before you sign, and read it for four things: technical limits, working rules, design restrictions and end-of-lease obligations. Each one can change what your office costs, or whether it fits at all.

· Updated · 6 min read

Lease and building fit-out manual open on a walnut table in an empty shell-and-core floor with exposed services

Illustration generated with AI. Not a POA project.

Before you sign an office lease in Dubai, ask the landlord for the building’s fit-out guide and read it for four things: the technical limits of the floor, the rules on when and how work happens, the design restrictions on what you can build, and what you must remove when you leave. Together they decide whether the space can hold the office you have in mind.

Most tenants first see this document after signing, when every rule is already a constraint. Read before signing, it is one of the best tools for choosing between two floors.

What a fit-out guide is

Almost every managed commercial building in Dubai has one. It may be called a tenant fit-out manual, fit-out handbook or design and construction guidelines, and it is issued by the landlord, developer or building management. It sets out what tenants are allowed to build, how the works must be carried out, and which drawings and documents the landlord needs to review.

It is written to protect the building, so it is mostly a list of limits. Read with your office in mind, those limits say a lot about cost, programme and design freedom.

The leasing agent or building management can usually share it on request, sometimes with a short confidentiality undertaking. If a landlord will not provide it before signing, that is worth noting in itself.

Technical limits: can the floor hold your office?

This is the part to read first, because it can rule a floor out. Look for:

  • Electrical capacity. The power allowance for your unit, and whether more is available. A server room, a large pantry or dense desking can push past a standard allowance.
  • Air-conditioning and cooling. How cooling is provided, what capacity is allocated to your floor, and whether extra units are permitted for rooms that run warm. Check whether cooling is available outside normal building hours, and on what terms, if your team works late or at weekends.
  • Ceiling void and heights. The space between the slab and the ceiling governs what services can run above it, and whether an open ceiling is allowed at all.
  • Wet areas. Where water and drainage connections are available. A pantry or additional washroom usually has to sit near them, which shapes the whole plan.
  • Floor loading. Limits that matter for heavy items such as safes, compact archive storage or large stone counters.
  • Fire and life-safety systems. How changes to sprinklers, detectors and alarms are handled, and by whom.

If any of these is unclear, ask building management for the figure in writing.

Nominated contractors and approved suppliers

Many buildings require certain works to be carried out by a contractor they nominate or approve. This is common for anything that touches the building’s fire alarm, sprinklers, building management system or main electrical boards.

It matters before signing because nominated works are priced by someone you did not choose, and scheduled around their availability. The guide should say which systems are affected. Knowing this early gives you a more honest view of the office fit-out budget and timing for each building you compare.

Working rules: how the works will actually run

The second group of rules governs the site rather than the design. They are easy to skim and they shape the programme:

  • Working hours. Many towers restrict noisy works such as drilling and cutting to evenings, nights or weekends, so occupied floors are not disturbed.
  • Deliveries and lifts. Whether there is a service lift, how it is booked, and when large deliveries are allowed. Bespoke joinery and long stone pieces need a route into the building.
  • Contractor registration. What the landlord needs from your contractor before work starts: trade licence, insurance, method statements, safety plans.
  • Deposits and fees. Many buildings take a refundable fit-out deposit and may charge fees for drawing review, inspections or services connections. The guide usually states how and when the deposit is returned.

These rules differ between buildings, and restricted hours lengthen a fit-out. Our guide to the office fit-out timeline in Dubai shows where these rules land in the overall programme.

Design restrictions: what you can and cannot build

This is the section an office interior designer reads most closely. Typical restrictions include:

  • The façade zone. Rules about what can sit near the glazing, such as partitions meeting the window mullions, coloured films or blinds visible from outside. Many buildings specify a standard blind for every tenant.
  • Corridor frontage. Whether your entrance can be glazed, what door types are allowed, and what signage is permitted at the lift lobby or unit door.
  • Ceilings. Whether the landlord’s ceiling grid must be kept, replaced to a standard, or can be removed for an open ceiling.
  • Materials. Fire performance requirements for finishes, fabrics and joinery, and sometimes restrictions on specific materials.
  • Structural works. Whether new openings, raised floors or internal stairs between floors are possible, and what approval they need.

A building that requires a standard ceiling and blinds leaves less room for the warmth that materials and lighting bring, which we write about in our warm office materials guide. Better to know before you sign.

Approvals and drawing requirements

Every guide describes how the landlord reviews tenant drawings before issuing its no-objection, which the authority permit depends on. Our guide to office fit-out approvals in Dubai covers that sequence in detail.

At the leasing stage, the useful question is simple: how long does the landlord say its review takes, and does the fit-out or rent-free period you are being offered allow for it?

End of lease: reinstatement

Many guides, together with the lease itself, set out what happens when you leave. You may be required to return the floor to its original handover condition, remove partitions and joinery, or restore the landlord’s ceiling and lighting layout.

This affects how much you choose to build. If reinstatement is required, an elaborate fixed fit-out costs you twice: once to build, once to remove. Freestanding bespoke furniture that moves with you can be a better place to spend. Read this alongside the handover condition described in our guide to shell and core, Category A and Category B, and our explainer on make-good and reinstatement clauses for what the lease itself usually asks.

Turning the guide into questions for the landlord

A fit-out guide is generic to the building. Your office is specific. The most useful step is to set the two side by side with a test fit: a quick plan of your office on the actual floor, checked against the guide’s limits. It usually surfaces a few questions for the landlord about power, cooling, wet areas, working hours or reinstatement. Get the answers in writing before signing.

Reading the guide is one step in a longer sequence; our checklist for moving office in Dubai sets out the rest, from notice on the old lease to move week.

We are happy to read a building’s fit-out guide with you and test your plan against it while you are still comparing options. Tell us about your space.

Frequently asked questions

Can I get a building’s fit-out guide before signing a lease?

Usually, yes. The leasing agent or building management can normally share it on request, sometimes after a short confidentiality undertaking. If a landlord will not provide it before signing, ask for the key limits in writing instead.

What is the most important thing to check in a fit-out guide?

The technical limits, especially electrical capacity, cooling and where water and drainage connections are available. They decide whether the floor can support your pantry, server room and meeting rooms without costly upgrades.

Why do Dubai office buildings restrict fit-out working hours?

To protect other tenants from noise and disruption. Many towers limit drilling, cutting and similar works to evenings, nights or weekends, which affects how long the fit-out takes and should be reflected in the programme.

Do I have to use the landlord’s contractors for my fit-out?

Not for the whole fit-out in most buildings, but many landlords nominate or approve specific contractors for works on shared systems such as fire alarms, sprinklers and the building management system. The fit-out guide says which systems this applies to.

Does the fit-out guide say what I must remove when the lease ends?

It often refers to reinstatement, but the binding obligation is in the lease itself. Read both together and confirm with the landlord whether you must return the floor to its original handover condition.